Client : BHP Biliton
Year : 2007-2009
Scope of Work : Engineering design work for Electrical System in Haju Coal Handling Facility Project.
Client : PT. KPC
Year : 2009-2012
Scope of Work : Engineering design work for Electrical System in KPC OLC & TBCT Duplication Project.
Client : TOTAL MYANMAR
Year : 2013
Scope of Work : Electrical, Instrumentation & Telecoms including Fire & Gas, Equipment and JB works.
Client : STATOIL
Year : 2014-2015
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear.
Client : PETROBRAS
Yea r : 2015
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear.
Client : YAMAL LNG
Yea r : 2015-2017
Scope of Work : As-built Drawing, Pre-comm & Comm
LV MCC Panel and MV Switchgear.
Client : ADNOC
Yea r : 2017-2019
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel.
Client : PT. JAWA POWER
Year : 2020
Scope of Work : Electrical Work for Protection Relay Upgrade
Client : PGN-SAKA
Year : 2020
Scope of Work : Electrical & Instrumentation Work for Module WHP-C & WHP-D.
Client : LNGC
Year : 2021
Scope of Work : Cable Schedule & As-built Drawing, Pre-comm & Comm
LV MCC Panel and MV Switchgear .