Electrical & Instrumentation work for module Tyra Redevelopment Project
Client : Total Energies
Year : 2021-2022
Scope of Work : Pre-comm & Comm LV & MV Switchgear, Generator, Transformer and VFD
Electrical Work for Power House and Electrical Equipment , LNG Canada Project
Client : LNGC
Year : 2021
Scope of Work : Cable Schedule & As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear.
Electrical & Instrumentation work for module WHP-C & WHP-D, PGN-Saka Sidayu Project
Client : PGN-SAKA
Year : 2020
Scope of Work : Electrical & Instrumentation Work for Module WHP-C & WHP-D.
PLTU Paiton Electrical upgrade 150kV at PLTGU Paiton
Client : PT. JAWA POWER
Year : 2020
Scope of Work : Electrical Work for Protection Relay Upgrade
Electrical Work for Power House and Electrical Equipment, Upper Zakum Project
Client : ADNOC
Year : 2017-2019
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel.
Electrical Work for Power House and Electrical Equipment, Yamal LNG Project
Client : YAMAL LNG
Year : 2015-2017
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear.
Prefabricated Power House and Electrical Equipment, Petrobras Project
Client : PETROBRAS
Year : 2015
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear
Electrical Work for semi-submersible rig, Songa Offshore Project
Client : STATOIL
Year : 2014-2015
Scope of Work : As-built Drawing, Pre-comm & Comm LV MCC Panel and MV Switchgear.
Electrical, Instrumentation and Automation work for Enguri Rehabilitation Project Stage 2
Client : ENGURHESI LTD
Year : 2013-2014
Scope of Work : Electrical, Instrumentation & Automation Pre-com & Comm for Hydropower System
Electrical, Instrumentation and Telecom work for module Yadana Subsidence Project
Client : TOTAL MYANMAR
Year : 2013
Scope of Work : Electrical, Instrumentation & Telecoms including Fire & Gas, Equipment and JB works.
Engineering Design for KPC OLC & TBCT Duplication Project
Client : PT. KPC
Year : 2009-2012
Scope of Work : Engineering design work for Electrical System in KPC OLC & TBCT Duplication Project.
Engineering Design for Haju Coal Handling Facility Project
Client : BHP Biliton
Year : 2007-2009
Scope of Work : Engineering design work for Electrical System in Haju Coal Handling Facility Project.